High energy shock diamonds are visible in green light waves.
Robert Tang and Donald Degling in front of the Demo Plant.
View of Demo Plant in Wichita Falls, Texas.
Design of CEFCO Process pilot system for selective pollutant capture, including PM, SOx, NOx, and CO2.
CEFCO Process system demonstration plant in China (2017)
View of demo plant from ground level
White vapor cloud in the clear blue sky above a China coal-fired power plant using CEFCO Technology.
Shock Spool Assembly
CEFCO China Company
Testing crew takes pictures of impressive results.
Preliminary but positive results during initial testing.
Success: Near Zero Emissions for Dust (PM2.5) and SO2
“The CO2 system processes up to 50#/min (23kg/min) of stack gas per shocktube. The fixed cost of running a shocktube is less than $5/hr of total utility. The goal is to maximize production given this ultra-low OPEX.”